Call for Sites Form
Developer
Land South of Northampton Road, Bromham
Agriculture
Residential
Allocated residential (currently agricultural)
Residential
A428 and agricultural beyond
345
No answer given
30 dph
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
No answer given
Two access points proposed to Bedford Road, please see supporting documents
345
No answer given
No answer given
No answer given
year 1 / 2
Sustainable Design and Construction methods to deliver water and energy efficiency. Commitment to delivering a biodiversity net gain. The site is in flood zone 1, the development will incorporate SUDS to control the outfall of surface water from this site. The development will have an emphasis on encouraging sustainable travel including walking, cycling and use of public transport.
17.21
Adjacent to sites 19/457/751. The site is located south of Northampton Road in the Bromham area approximately 4 miles west of Bedford town centre. The access points are all located on Northampton Road, which is a 40mph speed limit road outside of the site. The proposed development could cause traffic congestion on Northampton Road and mitigation measures may be necessary. The nearest bus stops are located outside of the site. A shared cycle and footway is situated opposite the site. A Transport Assessment would be needed to assess the impact of the development on the highway network, especially in Northampton Road and at the Northampton Road/Chestnut Avenue, Northampton Road/A428 junctions. This should also consider the cumulative impact of proposed neighbouring developments. Potential signalisation of the junction Northampton Road/A428 needed. Provide crossing to shared footway/cycle path. Consider reducing the speed limit of Northampton Road along the frontage of the site to 30mph. Upgrade of bus facilities outside of the site recommended.
only noise concern is A428
The site has been excluded from further assessment at Stage 1 because its location is not in accordance with the development strategy.